Analysis

You are here: Home / Analysis

Independence | Flexibility | Choice

*All prices GST exclusive

Independent Options : Non Recommending

Results are returned in a spread sheet, perfect for late fertiliser decisions and independent consultant analysis.

SoilTech Triangle Logo

SoilTech Basic Nutrient Analysis

Colwell P & K, NH4+, NO3, S, OC, pH(H2O), pH(CaCl2), EC (Salt), PBI

Results in Excel delivered to you or your consultant

pH & Nutrient Maps Included

SoilTech Triangle Logo

SoilTech Comprehensive Nutrient Analysis

Basic + PBI plus Boron, DTPA(Cu, Zn, Mn, Fe) and Exch. Cations (Ca, Mg, Na, K, Al)

Results in Excel delivered to you or your consultant

pH & Nutrient Maps Included

Apal Logo

Apal Nutrient Analysis

 Click Here to view the package options availble from APAL

pH & Nutrient Maps Included

Fertiliser Recommending Options

Results are returned by your fertilser company along with a fertilser recommendation.

CSBP Logo

CSBP NuLogic Analysis

Please click here for CSBP NuLogic Information

NuLogic Report and Fertiliser Recommendation delivered by CSBP

SoilTech pH Maps Included

landmark

Landmark Soil Analysis

For more information, contact you local Landmark agronomist.

SoilTech pH Maps Included

Summit Logo

Summit Analysis

Click here for info about Soil Analyses with Summit.

Report and Fertiliser Recommendation delivered by Summit. Talk to your Area Manager for more infomation.

SoilTech pH Maps Included

Midsoil, Subsoil & Deeper Analyses* POA

*All prices GST exclusive

SoilTech Triangle Logo

SoilTech Subsoil Analysis

Results in Excel delivered to you or your consultant

SoilTech pH Map Included

  • pH(CaCl2) Only
  • pH + NO3- , NH4+
  • pH + NO3- , NH4+, P and K
  • pH & Exchangable Cations
  • pH + P, K and Al
  • pH + NO3- , NH4+, P, K and S
  • pH + Electrical Conductivity (salt), P and K

+ more

 

 

 

 

 

Laboratories we use –

SoilTech Triangle Logo

SoilTech (pH Only)

Apal Logo

CSBP Logo

landmark

Any sample taken from any soil layer can undergo any analysis listed above.

Changes to the choice of analysis made after the samples are shipped by the contractor will attract a $5 service fee on top of the price of the analysis.